Thursday, February 27, 2020

Criteria 1--The Environment

Four criteria were researched, analyzed, and mapped:

Environmental Impact.  By using a topographic map and downloading shapefiles from the National Wetlands Inventory, I plotted all sensitive environmental areas on my map. I added all required shapefiles and created a 400ft buffer around the preferred corridor. The Study Area and Preferred Corridor feature classes were the base from which all other maps were produced.

Once all the feature classes were populated on the map, I was then able to utilize GIS tools to determine the number of areas and acres impacted by the corridor. The requirements and goal of the study was to protect wetlands, route the corridor through disturbed land, and sustain the aesthetics of the area.

Throughout my project, I retained consistent symbology to avoid confusion. I also color coded the map borders to categorize them based on criteria.

Macro View of Environmental Map


This is one of many environmental maps and graphs produced to demonstrate the
impact of the transmission line on the environment.




Final Project

This blog post is going to be multi-part. The final project was based on the Bobwhite-Manatee Transmission Line in Manatee and Sarasota Counties, Florida.

Below is the updated model.

Project Model for the Bobwhite-Manatee Transmission Line Project



Sunday, February 23, 2020

Final Project Model
A requirement for the final project of the GIS 4043/5050 course is to construct a model that outlines a story map. The story map will assess the proposed route of the Bobwhite-Manatee Transmission Line through Sarasota and Manatee Counties, Florida. Though the line is already operational, it is a good assignment to bring together everything I have learned this semester.

To conduct the final project, I have to assess specific criteria: Impact on sensitive environmental areas and wetlands, impact on houses/parcels, schools, and registered day cares, and then determine the length of the proposed route and cost.

The model serves as a template much like an outline for writing a thesis. As shown below, the model begins with a problem statement, identifies data sets required, tentatively templates maps to be built, provide the GIS procedures to be used, and defines the result.

Though this model has been built, just like an outline, it is a living document and will evolve as the project progresses. However, it is a good tool to frame the project.

Final Project Model